NOK-08: Simultaneous connections

NOK-08: Simultaneous connections

Test description:

The application can use simultaneous connections properly (if supported in the device and/or network).

Steps to conduct the test:

  1. Start the application.

  2. Start the data connection from the application.

  3. Check the information displayed in the Connection manager.

  4. Start the Web browser and go to www.google.com.

  5. Go to the Connection manager and disconnect the connection.

Expected test result:

The Connection manager shows the application's data connections correctly.

The connection can be disconnected from the Connection manager.

Other applications can use the connection simultaneously.

Notes:

This test case applies only if simultaneous connections are supported by the device and/or network. S60 3rd Edition devices and most networks do not support this feature.

Exceptions:

Pass:____ Fail:____ Pass with exception: ____